How To Install Drop Ceiling Grid
If you don t plan to install a drop in fluorescent fixture measure down about 4 in.
How to install drop ceiling grid. Snap a chalk line marking the top of the wall angle. Begin by reviewing your layout and predetermined border measurements to. How to install a basic drop ceiling grid track system in your basement step 1 cutting and installing the main runners.
How to install a drop ceiling. Step 2 install the l channel. Step 1 design your drop ceiling grid.
Nail the wall angle at every stud with 1 1 4 in. Insert the end of the long main tees in the wall angle at one end of the room using support wires to hold in place. After the two main runners have been temporarily hung go to.
Literally measure and make a to scale drawing of each room. From the existing ceiling joists. Measure cut and connect to extend the long grid pieces as needed to span the length of the room.
Preparing the space for installation measuring for your border panels and for hanging hardware placement installing the ceiling grid cutting border panels and then fitting panels into the grid. The first step is to determine the maximum height of the new suspended ceiling. Pick a height so the ceiling tile will clear the lowest ceiling obstruction like plumbing lines or ductwork.
In a nutshell installing a drop ceiling has several parts. Install the main tees long pieces. It starts with a game plan.